Surface    |    Backfill    |    About    |    Contact


19.7.01

And at long last, the Persson steps are fixed! Today they finally got rid of the traffic cones and caution tape that were blocking the lower doors, and the railings on both sides of the stairs are done. Now once they finish painting rocks on the outside of the Library porch (yes, they're painting rocks instead of putting actual stone facing on the building. Don't ask me why), the work on the hill will be done.

I've been listening to this a lot lately. Hooray for bagpipes.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home